Search plants, projects, owners, and states
20 MW Solar operating in York, ME
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
43.4322, -70.7273
County
York, ME
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Walden Renewables Development LLC | Nautilus Solar Solutions | — |
| Owner(s) | Walden Renewables Development LLC | Nautilus Solar Solutions | — |
| Status | Operating | operating | — |
GEM identifies the owner as Nautilus Solar Solutions
This entity is not yet in the GEM ownership database — chain unavailable.
No description available for this plant.
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
—
Balancing Authority
No generation data available for this plant.
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $51.7M
Point of Interconnection
Nearest Substation
Sanford Substation · 115 kV
Substation Distance
0.702 km
Operator
Central Maine Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.SANFORD 34.5
Pricing Hub
.Z.MAINE
Location Type
NETWORK NODE
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
—
Grid Voltage
—
Regulatory Status
—
Entity Type
—
Sector
IPP Non-CHP