1.2 MW Solar under construction in Prince Georges, MD
1.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
38.8713, -76.7339
County
Prince Georges, MD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pivot Energy | — | — |
| Owner(s) | Pivot Energy | — | — |
| Status | Under construction | — | — |
NCBP TWELVE, LLC is a 1.2 MW solar photovoltaic power plant located in Prince Georges County, Maryland. The plant's primary fuel source is solar energy. It consists of a single generator utilizing fixed-tilt solar tracking technology. Pivot Energy is the plant's operator, according to the Energy Information Administration (EIA).
The plant operates within the PJM Interconnection, LLC balancing authority, which is part of the ReliabilityFirst Corporation (RFC) NERC region. In terms of size, NCBP TWELVE, LLC ranks as the 163rd largest power plant in Maryland out of 183, and it holds a national ranking of 6193 out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $1.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Mitchellville Substation
Substation Distance
< 10 km
Operator
Baltimore Gas & Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Alt. Hub / Zone
DOMINION HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about NCBP TWELVE, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.