Search plants, projects, owners, and states
200 MW Solar operating in Cass, IN
200 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
40.7055, -86.2490
Reference point reported to EIA.
County
Cass, IN
Nearby Plants
Voltage information is incomplete along this route; the electrical connection remains unconfirmed.
2 mapped line sections connect the two facilities over 3.750 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Appleseed Solar, LLC | NextEra Energy Inc | — |
| Owner(s) | Appleseed Solar, LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Appleseed Solar is a 200 MW solar photovoltaic power plant located in Cass County, Indiana. The plant, identified by plant ID 69063, is owned by NextEra Energy and operated by Appleseed Solar, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. Appleseed Solar is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and falls within the ReliabilityFirst Corporation (RFC) NERC region.
In its most recent year of operation, Appleseed Solar generated 150,379 MWh of electricity, achieving a capacity factor of 17.1%. Appleseed Solar is the 15th largest solar plant in Indiana out of 35, and ranks 234th nationally out of 639 solar plants. Financial data indicates that the plant has a power purchase agreement (PPA) price of $60.3 per MWh, as reported to FERC.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
12.8K MWh
Latest Month
150.4K MWh
Annual Generation
17.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Appleseed Solar, LLC · Data from 2025
$60.3/MWh
PPA Price
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Walton Substation · 345 kV
Substation Distance
< 10 km
Operator
Duke Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
INDIANA.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
1 buyer • 2 active contracts
Last updated 2026-03-26
View all articlesSolar queue pipeline by status
Data tables and metrics from the InfraSure database.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra Energy
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra entity test
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.