Search plants, projects, owners, and states
1 MW Solar operating in Chippewa, MN
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
44.9834, -95.7118
County
Chippewa, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MN CSG 2019-113 LLC | United States Solar Corp | — |
| Owner(s) | MN CSG 2019-113 LLC | United States Solar Corp | — |
| Status | Operating | operating | — |
GEM identifies the owner as United States Solar Corp
This entity is not yet in the GEM ownership database — chain unavailable.
MN CSG 2019-113 is a 1 MW solar photovoltaic power plant located in Chippewa County, Minnesota. The plant is owned and operated by MN CSG 2019-113 LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant's balancing authority is the Midcontinent Independent Transmission System Operator, Inc. (MISO), and it is situated within the NERC region MRO. In terms of size, MN CSG 2019-113 ranks as the 271st largest power plant in Minnesota out of 540, and nationally it is ranked 6579 out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $1.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Fiesta City Substation · 69 kV
Substation Distance
< 10 km
Operator
Xcel Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about MN CSG 2019-113