100 MW Solar operating in Pickaway, OH
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
39.6000, -83.1560
County
Pickaway, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Dominion Renewable Energy | — | — |
| Owner(s) | Dominion Renewable Energy | — | — |
| Status | Operating | — | — |
Buckeye Solar is a 100 MW solar photovoltaic power plant located in Pickaway County, Ohio. The plant began operating in 2025 and is owned and operated by Dominion Renewable Energy. It consists of a single generator utilizing fixed-tilt solar tracking technology. Buckeye Solar is interconnected to the grid within the PJM Interconnection, LLC balancing authority, which falls under the RFC NERC region.
In its latest year of operation, Buckeye Solar generated 191,713 MWh of electricity, achieving a capacity factor of 21.9%. The plant is ranked as the 26th largest solar facility in Ohio out of 31, and 599th nationally out of 639.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Investor-Owned Utility
Sector
IPP Non-CHP
0 MWh
Latest Month
191.7K MWh
Annual Generation
21.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $160.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Atlanta Substation · 345 kV
Substation Distance
4.753 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
ATLNTA 69 KV BUCKEYSP
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
Last updated 2026-03-26