Search plants, projects, owners, and states
25 MW BESS planned in Los Angeles, CA
25 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
34.1274, -118.1477
County
Los Angeles, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Glenarm BESS LLC | City of Pasadena - (CA) | — |
| Owner(s) | City of Pasadena - (CA) | City of Pasadena - (CA) | — |
| Status | Planned | — | — |
The Glenarm BESS Plant is a 25 MW battery energy storage system located in Los Angeles County, California. The plant is owned by the City of Pasadena (CA) and operated by Glenarm BESS LLC. It consists of a single generator utilizing battery technology and is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. The plant's primary fuel is listed as MWH, indicating it draws power from the grid to charge its batteries.
Glenarm BESS Plant is ranked as the 177th largest power plant in California out of 300, and 666th nationally out of 1205. Recent news coverage includes 5 articles related to the industry, 3 related to the grid, and 2 related to deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $34.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
GLNARMC1_7_B1
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Glenarm BESS PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.