Search plants, projects, owners, and states
1.7 MW Solar operating in Sacramento, CA
1.7 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
38.4600, -121.4200
County
Sacramento, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | KP South Sacramento Hospital Solar, LLC | Citigroup | — |
| Owner(s) | Citigroup | Citigroup | — |
| Status | Operating | operating | — |
KP South Sacramento Medical Solar is a 1.7 MW solar photovoltaic power plant located in Sacramento County, California. The plant began operating in 2023 and is owned and operated by Kaiser Permanente South Sacramento Medical Center. It utilizes a single generator and fixed-tilt solar tracking technology.
The plant's location places it within the Balancing Authority of Northern California balancing authority area and the Western Electricity Coordinating Council (WECC) NERC region. KP South Sacramento Medical Solar ranks as the 565th largest solar facility in California out of 862, and 5589th nationally out of 7108. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Balancing Authority of Northern California (BANC)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $2.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about KP South Sacramento Hospital SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.