Search plants, projects, owners, and states
200 MW Batteries (100 MW) + Solar Photovoltaic (100 MW) under construction in Imperial, CA
200 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
32.6851, -115.2977
County
Imperial, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Imperial Sun Solar LLC | — | — |
| Owner(s) | Imperial Sun Solar LLC | — | — |
| Status | Under construction | announced | — |
Imperial Sun Solar is a 200 MW hybrid power plant located in Imperial County, California. The facility, owned and operated by Imperial Sun Solar LLC, combines solar photovoltaic generation with battery storage. It consists of two generators utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is listed as MWH, indicating its reliance on solar energy.
The plant operates within the Imperial Irrigation District balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. According to state rankings, Imperial Sun Solar is the 65th largest power plant out of 112 in California. Nationally, it is ranked 325th out of 514 power plants. The plant has been the subject of 10 news articles, with coverage focusing on industry trends and regulatory matters.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Imperial Irrigation District (IID)
Grid Voltage
92.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $272.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
LMP Node
COACHELV_2_N101
Pricing Hub
—
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.