150 MW Solar operating in Fulton, IL
150 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
40.3541, -90.3482
County
Fulton, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pleasantville Solar Park LLC | Pleasantville Solar Park LLC | — |
| Owner(s) | Pleasantville Solar Park LLC | Pleasantville Solar Park LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Pleasantville Solar Park LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Pleasantville Solar Park is a 150 MW solar photovoltaic power plant located in Fulton County, Illinois. The plant, identified by the EIA plant code 68880, is owned and operated by Pleasantville Solar Park LLC. It utilizes fixed-tilt solar tracking technology. The facility consists of a single generator and ranks as the 12th largest solar plant in Illinois out of 19, and 398th nationally out of 639.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. Its primary fuel source is solar energy (SUN). News coverage related to the plant has focused on regulatory and grid-related topics.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
11.2K MWh
Latest Month
—
Annual Generation
—
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $240.9M
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match
Last updated 2026-03-26