80 MW Batteries (40 MW) + Solar Photovoltaic (40 MW) under construction in Tulare, CA
80 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
35.8656, -119.4559
County
Tulare, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Angiola East LLC | — | — |
| Owner(s) | Angiola East LLC | — | — |
| Status | Under construction | construction | — |
The Angela Solar Project is an 80 MW hybrid power plant located in Tulare County, California. The plant, identified by plant ID 68854, is owned and operated by Angiola East LLC. It utilizes both solar photovoltaic technology and batteries for energy storage, with two generators on site. The primary fuel source is listed as MWH, indicating the plant's reliance on electricity generated from solar resources. The solar array uses a fixed tilt tracking system.
The Angela Solar Project operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 129th largest power plant in California out of 300, and nationally it holds a rank of 542 out of 1205. The plant has been the subject of 10 news articles, with coverage spanning industry trends, regulatory matters, and financial deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
52.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $108.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
S0479_7_N003
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Last updated 2026-03-26
View all 6 articlesNo Ask reports yet for this entity.
Ask about Angela Solar ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.