3.8 MW Batteries (1 MW) + Solar Photovoltaic (3 MW) operating in Bristol, MA
3.8 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2021
Operating Since
Coordinates
41.6791, -70.8944
County
Bristol, MA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sunrise on Wing Ln. LLC | — | — |
| Owner(s) | Sunrise on Wing Ln. LLC | — | — |
| Status | Operating | operating | — |
Apollo is a 3.8 MW hybrid power plant located in Bristol County, Massachusetts. The facility, which came online in 2021, is owned and operated by Sunrise on Wing Ln. LLC. The plant utilizes both solar photovoltaic and battery storage technologies, with electricity listed as its primary fuel source. It consists of two generators and features a fixed tilt solar tracking system. The battery energy storage system (BESS) has a capacity of 2.8 MWh and a duration of 2.15 hours, employing lithium-ion battery chemistry (LIB).
Apollo operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its latest year of operation, the plant generated 2,148 MWh of electricity, achieving a capacity factor of 6.4%. Apollo ranks as the 88th largest power plant in Massachusetts out of 126 facilities and is ranked 1,043rd nationally out of 1,205 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
0 MWh
Latest Month
2.1K MWh
Annual Generation
6.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2021
$2,988/kW
Est. Construction Cost
Total estimated cost: $11.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Wing Lane Substation · 115 kV
Substation Distance
0.297 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.WINGLANE13.2
Pricing Hub
.H.INTERNAL_HUB
Location Type
NETWORK NODE
Node Source
Curated node match
Last updated 2026-03-26