Search plants, projects, owners, and states
248.1 MW Batteries (99 MW) + Solar Photovoltaic (150 MW) planned in Glasscock, TX
248.1 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
32.0239, -101.2840
County
Glasscock, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Red River Clean Energy | — | — |
| Owner(s) | Red River Clean Energy | — | — |
| Status | Planned | pre-construction | — |
Cannibal Draw Solar and Storage is a hybrid power plant located in Glasscock County, Texas. The facility has a total capacity of 248.1 MW and is operated by Red River Clean Energy. The plant utilizes two generators employing both solar photovoltaic and battery storage technologies. Its primary fuel source is listed as MWH, reflecting the hybrid nature of the plant. Cannibal Draw operates within the Electric Reliability Council of Texas (ERCOT) balancing authority.
The plant's solar photovoltaic component uses a fixed tilt tracking system. Cannibal Draw Solar and Storage ranks as the 70th largest power plant in Texas out of 224, and nationally it ranks 214th out of 514. The facility is located within the TRE NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $337.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo