Search plants, projects, owners, and states
1.6 MW Natural Gas operating in Bell, TX
1.6 MW
Nameplate Capacity
4
Generators
units
Natural Gas Internal Combustion Engine
Technology
2024
Operating Since
Coordinates
31.1524, -97.3612
County
Bell, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Texas Microgrid, LLC | — | — |
| Owner(s) | Texas Microgrid, LLC | — | — |
| Status | Operating | — | — |
HEBTEMDistCenter1B is a natural gas-fired power plant located in Bell County, Texas. The plant has a total capacity of 1.6 MW and consists of 4 generators utilizing natural gas internal combustion engine technology. It began operating in 2024 and is owned and operated by Texas Microgrid, LLC.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. In terms of size, HEBTEMDistCenter1B ranks as the 190th largest power plant in Texas out of 312 plants, and 1759th nationally out of 1963 plants. The plant is within the TRE NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
160 MWh
Latest Month
—
Annual Generation
—
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$782/kW
Est. Construction Cost
Total estimated cost: $1.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about HEBTEMDistCenter1BForward forecasts, scenario decomposition, and risk-decision tooling for this asset.