Search plants, projects, owners, and states
1 MW Solar operating in Lincoln, AR
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
33.9612, -91.8106
County
Lincoln, AR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Today's Power, Inc. | Today's Power, Inc. | — |
| Owner(s) | Today's Power, Inc. | Today's Power, Inc. | — |
| Status | Operating | operating | — |
GEM identifies the owner as Today's Power, Inc.
This entity is not yet in the GEM ownership database — chain unavailable.
The Star City School District solar photovoltaic plant is located in Lincoln County, Arkansas. The plant, owned and operated by Today's Power, Inc., began commercial operation in 2021. It has a total capacity of 1 MW consisting of a single generator. The plant utilizes single-axis tracking to maximize solar energy capture.
The facility's primary fuel source is solar energy. In its most recent year of operation, the plant generated 2,781 MWh of electricity, achieving a capacity factor of 31.6%. The Star City School District plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC Reliability Corporation NERC region. In terms of size, the plant ranks 66th out of 77 solar facilities in Arkansas and 6923rd out of 7108 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.2 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
130 MWh
Latest Month
2.8K MWh
Annual Generation
31.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2021
$1,431/kW
Est. Construction Cost
Total estimated cost: $1.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ARKANSAS.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Star City School DistrictForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo