Search plants, projects, owners, and states
1 MW Solar operating in Clark, AR
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
34.1635, -93.0872
County
Clark, AR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Today's Power, Inc. | Today's Power, Inc. | — |
| Owner(s) | Today's Power, Inc. | Today's Power, Inc. | — |
| Status | Operating | operating | — |
GEM identifies the owner as Today's Power, Inc.
This entity is not yet in the GEM ownership database — chain unavailable.
South Central Electric Cooperative is a 1 MW solar photovoltaic power plant located in Clark County, Arkansas. The plant began operating in 2019 and is operated by Today's Power, Inc. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the SERC NERC region.
The facility consists of a single generator and in the most recent year of data, it produced 2,102 MWh of electricity. This corresponds to a capacity factor of 23.9%. In terms of size, South Central Electric Cooperative is ranked 71st out of 77 power plants in Arkansas and 6928th out of 7108 plants nationally. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
90 MWh
Latest Month
2.1K MWh
Annual Generation
23.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2019
$1,542/kW
Est. Construction Cost
Total estimated cost: $1.5M
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ARKANSAS.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about South Central Electric Cooperative