Search plants, projects, owners, and states
5 MW Solar operating in Pulaski, AR
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
34.7435, -92.1799
County
Pulaski, AR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Today's Power, Inc. | Today's Power, Inc. | — |
| Owner(s) | Today's Power, Inc. | Today's Power, Inc. | — |
| Status | Operating | operating | — |
GEM identifies the owner as Today's Power, Inc.
This entity is not yet in the GEM ownership database — chain unavailable.
NLRED 5MW is a solar photovoltaic power plant located in Pulaski County, Arkansas. The plant has a total capacity of 5 MW and began operating in 2024. It is owned and operated by Today's Power, Inc. The facility consists of a single generator and utilizes single-axis solar tracking technology to maximize energy capture.
The plant's primary fuel source is solar energy. In its most recent year of operation, NLRED 5MW generated 2,882 MWh of electricity, resulting in a capacity factor of 6.6%. The plant operates within the Southwest Power Pool (SPP) balancing authority and the SERC NERC region. NLRED 5MW is ranked as the 25th largest solar plant in Arkansas out of 77, and nationally it is ranked 2561 out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
13.2 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
500 MWh
Latest Month
2.9K MWh
Annual Generation
6.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $7.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Faulkner Lake Substation · 115 kV
Substation Distance
< 10 km
Operator
Entergy Arkansas
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPPSOUTH_HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about NLRED 5MWForward forecasts, scenario decomposition, and risk-decision tooling for this asset.