Search plants, projects, owners, and states
4.1 MW Solar operating in Fulton, NY
4.1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
42.9860, -74.1830
County
Fulton, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Scale Sustainable I, LLC | — | — |
| Owner(s) | Scale Sustainable I, LLC | — | — |
| Status | Operating | operating | — |
Maple North 1 is a 4.1 MW solar photovoltaic power plant located in Fulton County, New York. The plant began operating in 2024 and utilizes single-axis tracking technology to maximize solar energy capture. It has one generator. The facility is owned and operated by Scale Sustainable I, LLC.
The plant is connected to the New York Independent System Operator (NYISO) balancing authority, within the Northeast Power Coordinating Council (NPCC) NERC region. Maple North 1 ranks as the 328th largest power plant in New York State out of 695 facilities, and 3371st nationally out of 7108 plants. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $10.6M
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone F
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Maple North 1New York Independent System Operator (NYIS)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP