Search plants, projects, owners, and states
5 MW Solar operating in Warren, NY
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
43.3229, -73.6124
County
Warren, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CVE US EI8 Quaker LLC | — | — |
| Owner(s) | CVE US EI8 Quaker LLC | — | — |
| Status | Operating | operating | — |
The Quaker solar power plant is located in Warren County, New York. The facility has a total capacity of 5 MW and consists of a single generator utilizing solar photovoltaic technology. It commenced operations in 2024 and is owned and operated by CVE US EI8 Quaker LLC. The plant uses single-axis tracking to maximize solar energy capture.
Quaker operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its latest year of operation, the plant generated 125 MWh of electricity, achieving a capacity factor of 0.3%. The plant's ranking in terms of size is 86 out of 695 solar plants in New York state, and 2280 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
125 MWh
Latest Month
125 MWh
Annual Generation
0.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $12.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
ADK RESOURCE___RCVRY
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone F
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about QuakerForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo