2.4 MW Solar operating in Polk, GA
2.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
34.0469, -85.2113
County
Polk, GA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Westbound Solar 3, LLC | — | — |
| Owner(s) | Westbound Solar 3, LLC | — | — |
| Status | Operating | operating | — |
Polk Cedartown 2 is a 2.4 MW solar photovoltaic power plant located in Polk County, Georgia. The plant, which began operating in 2023, is owned and operated by Westbound Solar 3, LLC. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. The plant's location places it within the Southern Company Services, Inc. - Trans balancing authority and the SERC NERC region.
In its most recent year of operation, Polk Cedartown 2 generated 3,848 MWh of electricity, achieving a capacity factor of 18.3%. Based on total capacity, the plant ranks as the 112th largest solar facility in Georgia out of 164, and 4364th nationally out of 7108. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southern Company Services, Inc. - Trans (SOCO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
242 MWh
Latest Month
3.8K MWh
Annual Generation
18.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $3.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.