75 MW Solar planned in Lea, NM
75 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
32.7323, -103.2748
County
Lea, NM
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lydian Energy | Lydian Energy | — |
| Owner(s) | Lydian Energy | Lydian Energy | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Lydian Energy
This entity is not yet in the GEM ownership database — chain unavailable.
AC Ranch I is a 75 MW solar photovoltaic power plant located in Lea County, New Mexico. The plant, which utilizes fixed-tilt solar tracking technology, is operated by Lydian Energy. It is interconnected to the Southwest Power Pool (SPP) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. The facility has one generator.
AC Ranch I is ranked as the 6th largest solar plant in New Mexico out of 84 facilities, and 779th nationally out of 7108 plants. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $115.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Maddox substation · 115 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
—
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26