No longer in EIA's lists of operating or planned plants. Last listed in January 2026. EIA-860M · Sep 2026
1 MW Solar in Tazewell, IL
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
40.6808, -89.5845
County
Tazewell, IL
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Riverside Drive Solar Project 2022, LLC | — | — |
| Owner(s) | Riverside Drive Solar Project 2022, LLC | — | — |
| Status | No longer listed | operating | — |
The Lowe's - 1193 - East Peoria, IL solar photovoltaic plant is located in Tazewell County, Illinois. The plant has a total capacity of 1 MW and consists of a single generator. It began operating in 2025 and is owned and operated by Riverside Drive Solar Project 2022, LLC. The plant utilizes a fixed tilt solar tracking system.
The facility's primary fuel source is solar energy (SUN). It operates within the Midcontinent Independent Transmission System Operator, Inc. balancing authority and the SERC NERC region. In terms of size, the plant is ranked 317 out of 320 solar facilities in Illinois and 6915 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
—
Balancing Authority
—
Grid Voltage
—
Regulatory Status
—
Entity Type
—
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $1.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Wallace Substation · 138 kV
Substation Distance
0.862 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
AMIL.AEM.CAT
Pricing Hub
ILLINOIS.HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Lowe's - 1193 - East Peoria, ILForward forecasts, scenario decomposition, and risk-decision tooling for this asset.