150 MW Solar under construction in Knox, IN
150 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
38.6922, -87.2877
County
Knox, IN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Origis Energy USA, Inc | Origis Energy | — |
| Owner(s) | Origis Energy USA, Inc | Origis Energy | — |
| Status | Under construction | construction | — |
GEM identifies the owner as Origis Energy
This entity is not yet in the GEM ownership database — chain unavailable.
The Wheatland solar photovoltaic plant is located in Knox County, Indiana. The facility has a total capacity of 150 MW and consists of a single generator. Origis Energy USA, Inc. operates the plant, which utilizes fixed-tilt solar tracking technology. Wheatland's primary fuel source is solar energy.
Wheatland operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the broader NERC MRO region. It is ranked as the 24th largest solar plant in Indiana out of 35, and 368th nationally out of 639. Public sources show 10 news articles related to the plant, with coverage including industry trends, deals, hazards, and regulatory matters.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $240.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Wheatland Station · 345 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
INDIANA.HUB
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26
View all 10 articlesNo Ask reports yet for this entity.
Ask about WheatlandForward forecasts, scenario decomposition, and risk-decision tooling for this asset.