1.2 MW Batteries (1 MW) + Solar Photovoltaic (1 MW) operating in Contra Costa, CA
1.2 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2025
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
37.7754, -121.9613
Reference point reported to EIA.
County
Contra Costa, CA
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
4 mapped line sections connect the two facilities over 5.406 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Alcosta Boulevard BR 15-AA Solar Project 2020 LLC | — | — |
| Owner(s) | Alcosta Boulevard BR 15-AA Solar Project 2020 LLC | — | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Bishop Ranch - BR 15-AA is a 1.2 MW hybrid power plant located in Contra Costa County, California. The plant, which came online in 2025, is owned and operated by Alcosta Boulevard BR 15-AA Solar Project 2020 LLC. The primary fuel source is solar, utilizing solar photovoltaic technology. The facility also incorporates batteries for energy storage, with a battery energy storage system (BESS) duration of 2.2 hours. The solar panels are mounted with a fixed tilt.
The plant consists of 3 generators and operates within the California Independent System Operator (CAISO) balancing authority, falling under the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Bishop Ranch - BR 15-AA ranks as the 725th largest power plant in California out of 862, and nationally it is ranked 6188 out of 7108.
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $1.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
SANRAMON_2_N024
Pricing Hub
TH_NP15_GEN-APND
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.