Search plants, projects, owners, and states
1290 MW Natural Gas planned in Lee, TX
1,290 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combined Cycle
Technology
Planned: —
Planned Operation
Coordinates
30.4194, -97.1912
County
Lee, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SL Energy Power Plant I, LLC | — | — |
| Owner(s) | SL Energy Power Plant I, LLC | — | — |
| Status | Planned | — | — |
Sandow Lakes Energy Station is a 1290 MW natural gas-fired combined cycle power plant located in Lee County, Texas. The plant is owned and operated by SL Energy Power Plant I, LLC. It consists of two generating units and operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, in the TRE NERC region.
The plant is a significant power producer in Texas, ranking as the 10th largest out of 144 power plants in the state, and 92nd nationally out of 945 plants. News reports indicate at least one deal related to the plant.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$782/kW
Est. Construction Cost
Total estimated cost: $1.0B
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.