Search plants, projects, owners, and states
2.6 MW Solar operating in Clackamas, OR
2.6 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
45.2622, -122.3466
County
Clackamas, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clayfield Solar, LLC | — | — |
| Owner(s) | Clayfield Solar, LLC | — | — |
| Status | Operating | operating | — |
OR - Solops - SPI 18 - Clayfield is a solar photovoltaic power plant located in Clackamas County, Oregon. The plant, which began operating in 2024, has a total capacity of 2.6 MW and consists of a single generator. It is owned and operated by Clayfield Solar, LLC. The plant utilizes dual-axis solar tracking technology.
The plant's primary fuel source is the sun. In its most recent year of operation, it generated 202 MWh of electricity, resulting in a capacity factor of 0.9%. OR - Solops - SPI 18 - Clayfield operates within the Portland General Electric Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 77th largest solar plant in Oregon out of 147, and 4212th nationally out of 7108.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Portland General Electric Company (PGE)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
109 MWh
Latest Month
202 MWh
Annual Generation
0.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $4.0M
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about OR - Solops - SPI 18 - Clayfield