Search plants, projects, owners, and states
240 MW Solar operating in Union, OH
240 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2026
Operating Since
Coordinates
40.3780, -83.4369
County
Union, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cadence Solar Energy LLC | Invenergy LLC | — |
| Owner(s) | Cadence Solar Energy LLC | Invenergy LLC | — |
| Status | Operating | construction | — |
The Cadence Solar Energy Center is a 240 MW solar photovoltaic power plant located in Union County, Ohio. The plant is owned and operated by Cadence Solar Energy LLC. It utilizes fixed-tilt solar tracking technology. As of the current rankings, it is the 6th largest solar plant in Ohio out of 31, and the 165th largest in the United States out of 639.
The plant consists of a single generator. The primary fuel source is solar energy (SUN). The Cadence Solar Energy Center operates within the PJM Interconnection, LLC balancing authority, which falls under the RFC NERC region. Recent news articles indicate activity related to deals involving the plant.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $385.4M
Market Position
ISO/RTO Market
PJM
LMP Node
MARYSVI234.5 KV CADEN2SP
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
NextEra vs Duke
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
Top 10 solar states
Data tables and metrics from the InfraSure database.