Search plants, projects, owners, and states
600 MW Batteries (300 MW) + Solar Photovoltaic (300 MW) planned in Iron, UT
600 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
37.6134, -113.6440
County
Iron, UT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | BrightNight Power | BrightNight | — |
| Owner(s) | Cordelio BNC Holdings, LLC, WestDevco, LLC | BrightNight | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as BrightNight
This entity is not yet in the GEM ownership database — chain unavailable.
Red Butte Solar and Storage is a 600 MW hybrid power plant located in Iron County, Utah. The facility, owned and operated by BrightNight Power, combines solar photovoltaic generation with battery energy storage. It consists of two generators utilizing both battery and solar technologies. The solar component uses a fixed-tilt tracking system.
The plant is the second-largest of six solar facilities in Utah, and ranks 41st out of 514 solar plants nationally. Red Butte operates within the PacifiCorp - East balancing authority, which falls under the Western Electricity Coordinating Council (WECC) NERC region. The plant's primary fuel type is listed as MWH, indicating its reliance on electricity from solar and storage.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $926.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.