Search plants, projects, owners, and states
600 MW Batteries (300 MW) + Solar Photovoltaic (300 MW) planned in Garfield, WA
600 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
46.5024, -117.8263
County
Garfield, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | LOSN, LLC | — | — |
| Owner(s) | Cordelio BNC Holdings, LLC, WestDevco, LLC | — | — |
| Status | Planned | pre-construction | — |
Lower Snake Solar Generation BESS is a 600 MW hybrid power plant located in Garfield County, Washington. The facility, identified by plant ID 68344, is owned and operated by LOSN, LLC. It utilizes both solar photovoltaic and battery storage technologies, with electricity listed as its primary fuel type (MWH). The solar component employs a fixed-tilt tracking system.
The plant is the second-largest of six solar facilities in Washington state, and ranks 49th out of 514 nationally. It operates within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Recent news coverage indicates three articles related to deals involving the plant.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $926.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.