50 MW Solar under construction in Beltrami, MN
50 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
47.5465, -95.1300
Reference point reported to EIA.
County
Beltrami, MN
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
2 mapped line sections connect the two facilities over 6.972 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Otter Tail Power Co | Otter Tail Power Co | — |
| Owner(s) | Otter Tail Power Co | Otter Tail | — |
| Status | Under construction | pre-construction | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Solway Solar is a 50 MW solar photovoltaic power plant located in Beltrami County, Minnesota. The plant, identified by plant code 68340, utilizes a fixed-tilt solar tracking system. It is owned and operated by Otter Tail Power Company, a subsidiary of Otter Tail Corporation. The plant's primary fuel source is solar energy (SUN).
Solway Solar operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, situated in the Midwest Reliability Organization (MRO) NERC region. The plant is ranked as the 6th largest solar facility out of 540 in the state of Minnesota, and nationally it holds a rank of 1161 out of 7108 solar plants. The facility consists of one generator.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $80.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
Shared substation inference
2 buyers • 2 active contracts
Last updated 2026-03-26