74.9 MW Solar under construction in Shelby, TN
74.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
35.3583, -89.8458
County
Shelby, TN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SR Millington II, LLC | Silicon Ranch | — |
| Owner(s) | SR Millington II, LLC | Silicon Ranch Corp | — |
| Status | Under construction | operating | — |
GEM identifies the owner as Silicon Ranch Corp
This entity is not yet in the GEM ownership database — chain unavailable.
SR Millington II is a 74.9 MW solar photovoltaic power plant located in Shelby County, Tennessee. The plant is owned and operated by SR Millington II, LLC. It consists of a single generator and utilizes fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
SR Millington II operates within the Tennessee Valley Authority balancing authority and the SERC NERC region. It is the 7th largest solar plant in Tennessee out of 60, and ranks 810th nationally out of 7108 solar plants.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
161.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $115.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about SR Millington IIForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo