Canceled or postponed, according to EIA. Last listed as operating or planned in January 2026. EIA-860M · Sep 2026
160 MW Batteries (80 MW) + Solar Photovoltaic (80 MW) in Carroll, OH
160 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
40.6872, -81.0769
County
Carroll, OH
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Alpin Holding LLC | — | — |
| Owner(s) | Alpin Holding LLC | — | — |
| Status | Canceled or postponed | announced | — |
Echelon Solar is a 160 MW hybrid power plant located in Carroll County, Ohio. The facility, owned and operated by Alpin Holding LLC, utilizes both solar photovoltaic technology and battery storage. It consists of two generators and employs a fixed-tilt solar tracking system. Echelon Solar is interconnected to the PJM Interconnection, LLC balancing authority within the ReliabilityFirst Corporation (RFC) NERC region.
The plant's primary fuel source is listed as MWH, indicating the use of electricity from the solar array to charge the batteries. Echelon Solar ranks as the third largest of four solar plants in Ohio, and 370th out of 514 nationally. News coverage of the plant includes one article related to deals and one related to the industry.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $257.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
AEP-DAYTON HUB
Alt. Hub / Zone
WESTERN HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Echelon SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.