2 MW Solar operating in St Clair, IL
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
38.6230, -90.0871
County
St Clair, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pivot Energy | Pivot Energy | — |
| Owner(s) | Pivot Energy | Pivot Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as Pivot Energy
This entity is not yet in the GEM ownership database — chain unavailable.
St. Clair Solar 3 is a 2 MW solar photovoltaic power plant located in St. Clair County, Illinois. The plant began operating in 2024 and has a single generator. Pivot Energy is the owner and operator. The plant utilizes single-axis tracking to maximize solar energy capture.
The plant's latest annual generation was 158 MWh, resulting in a capacity factor of 0.9%. St. Clair Solar 3 interconnects to the grid within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority. In terms of size, St. Clair Solar 3 ranks as the 184th largest solar plant in Illinois out of 320, and 4953rd nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
158 MWh
Latest Month
158 MWh
Annual Generation
0.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $3.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about St. Clair Solar 3