Search plants, projects, owners, and states
Canceled or postponed, according to EIA. Last listed as operating or planned in December 2025. EIA-860M · Sep 2026
369 MW Solar in Milam, TX
369 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
30.5693, -97.0857
County
Milam, TX
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | EDF Renewable Asset Holdings, Inc. | EDF Renewable Asset Holdings, Inc. | — |
| Owner(s) | EDF Renewable Asset Holdings, Inc. | EDF Renewable Asset Holdings, Inc. | — |
| Status | Canceled or postponed | announced | — |
Walleye Solar, also known as Sandow II, is a 369 MW solar photovoltaic power plant located in Milam County, Texas. The plant is owned and operated by EDF Renewable Asset Holdings, Inc. It utilizes a single generator and fixed-tilt solar tracking technology. Walleye Solar is interconnected to the Electric Reliability Council of Texas (ERCOT) balancing authority, within the Texas Reliability Entity (TRE) NERC region.
The plant is a significant solar energy producer in Texas, ranking as the 27th largest of 192 solar plants in the state, and 50th largest of 639 nationally. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $569.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_HOUSTON
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Walleye Solar (Sandow II)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.