Search plants, projects, owners, and states
100 MW Solar planned in Culpeper, VA
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
38.4273, -77.9079
County
Culpeper, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenwood Solar I, LLC | NextEra Energy | — |
| Owner(s) | Greenwood Solar I, LLC | NextEra Energy | — |
| Status | Planned | pre-construction | — |
Greenwood Solar I is a 100 MW solar photovoltaic power plant located in Culpeper County, Virginia. The plant, identified by plant ID 68205, utilizes fixed-tilt solar tracking technology. It consists of a single generator and is owned by NextEra Energy and operated by Greenwood Solar I, LLC.
The facility operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. Based on total capacity, Greenwood Solar I ranks as the 24th largest solar plant in Virginia out of 25, and 625th nationally out of 639. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $154.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Mountain Run Substation · 115 kV
Substation Distance
3.279 km
Operator
Virginia Electric and Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
GERMANNA36.5 KV LD1
Pricing Hub
DOMINION HUB
Location Type
Load Node
Node Source
Curated node match
Last updated 2026-03-14
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo