139.5 MW Hydro operating in Fresno, CA
139.5 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1983
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
37.0718, -119.5580
Reference point reported to EIA.
County
Fresno, CA
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
5 mapped line sections connect the two facilities over 36.721 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pacific Gas & Electric Co. | Pacific Gas and Electric | — |
| Owner(s) | Pacific Gas & Electric Co. | PG&E | — |
| Status | Operating | operating | — |
Kerckhoff Dam is a concrete arch dam on the San Joaquin River in Fresno County, California, about 10 mi (16 km) southwest of Big Creek. The 114 ft (35 m) tall dam is a run-of-the-river facility impounding 4,252 acre⋅ft (5,245,000 m3) of water and is the primary feature of Pacific Gas and Electric's Kerckhoff hydroelectric project. The dam and its 160-acre (65 ha) reservoir provide water for the Kerckhoff Powerhouses No. 1 and No. 2. Powerhouse No. 1 has three Francis turbines producing a maximum of 38 megawatts (MW) and Powerhouse No. 2 has a single Francis turbine rated at 155 MW for a total project capacity of 193 MW. An annual 579.1 million KWh of electricity are generated here.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Kerckhoff 2 is a hydroelectric power plant located in Fresno County, California. The plant has a total capacity of 139.5 MW and began operating in 1983. It is owned and operated by Pacific Gas & Electric Co. (PG&E). The plant utilizes conventional hydroelectric technology with a single generator and its primary fuel source is water (WAT). Kerckhoff 2 operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, Kerckhoff 2 generated 418,557 MWh of electricity, achieving a capacity factor of 34.3%. According to available data, the installed cost of the plant was $1,418.32 per kW. Kerckhoff 2 is ranked as the 28th largest power plant out of 42 in California, and 139th out of 194 nationally.
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
32.1K MWh
Latest Month
418.6K MWh
Annual Generation
34.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Hydro with storage · PACIFIC GAS AND ELECTRIC COMPANY · Data from 2015–2024
$1,457/kW
Installed Cost
$7.2/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
KERCKHOF_7_B1
Pricing Hub
TH_NP15_GEN-APND
Alt. Hub / Zone
TH_ZP26_GEN-APND
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all 7 articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
FERC issued Notice of Authorization for Continued Project Operation for PG&E's Kerckhoff project, permitting generation to continue while the surrender and decommissioning process is pending.
sourceFederal Register published FERC notice of scoping meetings for PG&E's proposed surrender, decommissioning, and non-project use of lands associated with the Kerckhoff hydroelectric project.
source