200.2 MW Wind planned in Benton, IN
200.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
Planned: —
Planned Operation
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
40.5197, -87.1504
County
Benton, IN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Templeton Wind Energy Center, LLC | NextEra Energy Inc | — |
| Owner(s) | Templeton Wind Energy Center, LLC | NextEra Energy | — |
| Status | Planned | pre-construction | — |
Templeton Wind is a 200.2 MW wind power plant located in Benton County, Indiana. The facility is owned and operated by Templeton Wind Energy Center, LLC, a subsidiary of NextEra Energy. The plant utilizes onshore wind turbine technology and consists of one generator. As of the latest rankings, Templeton Wind is the 6th largest wind farm out of 23 in the state of Indiana, and the 295th largest out of 734 wind farms nationally.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, and is located within the ReliabilityFirst Corporation (RFC) NERC region. Templeton Wind's primary fuel source is wind (WND).
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
345.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,758/kW
Est. Construction Cost
Total estimated cost: $352.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
INDIANA.HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all articlesA specific company (e.g., NextEra Energy, Duke Energy)
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
NextEra vs Duke
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
NextEra vs Duke
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.