176.6 MW Batteries (76 MW) + Solar Photovoltaic (101 MW) planned in Goliad, TX
176.6 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
28.4200, -97.7093
County
Goliad, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Belltown Power Texas 2, LLC | — | — |
| Owner(s) | Belltown Power Texas 2, LLC | — | — |
| Status | Planned | pre-construction | — |
Myers Solar and Storage is a hybrid power plant located in Goliad County, Texas. The facility, owned and operated by Belltown Power Texas 2, LLC, has a total capacity of 176.6 MW across two generators. The plant utilizes both solar photovoltaic technology and battery storage, with the primary fuel listed as MWH. The solar component uses a fixed tilt tracking system.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, in the TRE NERC region. Myers Solar and Storage is ranked as the 141st largest power plant in Texas out of 224, and 343rd nationally out of 514. News coverage of the plant includes 7 articles, with topics including grid, industry, deals, and regulatory matters.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $240.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Beeville Substation · 69 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-14