5 MW Solar operating in Tompkins, NY
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
42.4480, -76.6090
County
Tompkins, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NSF Enfield Site 1, LLC | — | — |
| Owner(s) | NSF Enfield Site 1, LLC | — | — |
| Status | Operating | operating | — |
Enfield Solar Site 1 is a 5 MW solar photovoltaic power plant located in Tompkins County, New York. The plant began operating in 2024 and is owned and operated by NSF Enfield Site 1, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy (SUN).
The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its first year of operation, Enfield Solar Site 1 generated 309 MWh of electricity, achieving a capacity factor of 0.7%. The plant ranks 143rd out of 695 power plants in New York state, and 2494th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
239 MWh
Latest Month
309 MWh
Annual Generation
0.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $12.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone B
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Enfield Solar Site 1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo