Search plants, projects, owners, and states
90 MW Solar planned in Hancock, OH
90 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
41.1285, -83.5152
County
Hancock, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Leeward Asset Management, LLC | Leeward Energy | — |
| Owner(s) | Leeward Asset Management, LLC | Leeward Energy | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Leeward Energy
This entity is not yet in the GEM ownership database — chain unavailable.
South Branch Solar is a 90 MW solar photovoltaic power plant located in Hancock County, Ohio. The plant, identified by plant ID 68086, utilizes a fixed-tilt solar tracking system. Leeward Asset Management, LLC operates the facility, which consists of one generator. The plant's primary fuel source is solar energy (SUN).
South Branch Solar operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is ranked as the 33rd largest solar plant in Ohio out of 84, and nationally it holds a rank of 668 out of 7108. Public reporting indicates 10 news articles related to the plant, with 8 focused on regulatory matters and 2 on industry news.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $144.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Fostoria Central Substation · 345 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
AEP-DAYTON HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about South Branch SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo