60 MW Batteries (40 MW) + Solar Photovoltaic (20 MW) under construction in Dane, WI
60 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
42.9852, -89.4361
County
Dane, WI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Madison Gas & Electric Co | Madison Gas & Electric | — |
| Owner(s) | Madison Gas & Electric Co | MGE Energy | — |
| Status | Under construction | pre-construction | — |
The Sunnyside Solar Energy Center is a 60 MW hybrid power plant located in Dane County, Wisconsin. It is owned by MGE Energy and operated by Madison Gas & Electric Co. The plant utilizes both solar photovoltaic technology and batteries, with two generators on site. Its primary fuel source is listed as MWH (megawatt hours).
Sunnyside Solar Energy Center operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. The plant's solar arrays employ a fixed tilt configuration. It is ranked as the 5th largest solar facility out of 8 in the state of Wisconsin, and 581st out of 1205 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $81.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Oak Ridge Substation · 138 kV
Substation Distance
0.303 km
Operator
American Transmission Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
MGE.SSD_SLR2
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
ILLINOIS.HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Sunnyside Solar Energy CenterForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo