Search plants, projects, owners, and states
2 MW Solar operating in Marion, IL
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
38.6246, -89.1144
County
Marion, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pivot Energy | Pivot Energy | — |
| Owner(s) | Pivot Energy | Pivot Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as Pivot Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Marion Solar 4b LLC is a 2 MW solar photovoltaic power plant located in Marion County, Illinois. The plant began operating in 2024 and has one generator. Pivot Energy is the owner and operator. The facility utilizes single-axis tracking to maximize solar energy capture.
The plant's latest annual generation was 970 MWh, resulting in a capacity factor of 5.5%. Marion Solar 4b LLC operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region. In terms of size, the plant ranks 201st out of 320 power plants in Illinois and 5048th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
44 MWh
Latest Month
970 MWh
Annual Generation
5.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $3.2M
Point of Interconnection
Nearest Substation
Sandoval Substation
Substation Distance
< 10 km
Operator
Ameren
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Marion Solar 4b LLC