Search plants, projects, owners, and states
80 MW Batteries (40 MW) + Solar Photovoltaic (40 MW) planned in Kern, CA
80 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
34.9511, -118.3083
County
Kern, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Vesper Energy Development LLC | — | — |
| Owner(s) | Vesper Energy Development LLC | — | — |
| Status | Planned | pre-construction | — |
Syracuse and Tours Renewable Energy is a hybrid power plant located in Kern County, California. The facility has a total capacity of 80 MW and is operated by Vesper Energy Development LLC. The plant utilizes both solar photovoltaic and battery storage technologies. It consists of two generators and its primary fuel source is electricity (MWH). The solar array uses a fixed tilt tracking system.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Syracuse and Tours Renewable Energy is ranked as the 131st largest power plant in California out of 300, and 544th nationally out of 1205.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
66.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $108.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
CAISO
LMP Node
CATALGEN_7_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Syracuse and Tours Renewable EnergyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo