73 MW Solar under construction in Mayes, OK
73 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
36.3316, -95.2293
County
Mayes, OK
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Leeward Asset Management, LLC | Leeward Energy | — |
| Owner(s) | Leeward Asset Management, LLC | Leeward Energy | — |
| Status | Under construction | construction | — |
GEM identifies the owner as Leeward Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Saltbranch 2 is a 73 MW solar photovoltaic power plant located in Mayes County, Oklahoma. The facility, which utilizes fixed-tilt solar tracking technology, is operated by Leeward Asset Management, LLC. It connects to the Southwest Power Pool (SPP) balancing authority and is situated within the Midcontinent Reliability Organization (MRO) NERC region.
As of current rankings, Saltbranch 2 is the 9th largest solar plant in Oklahoma out of 22, and ranks 993rd nationally among 7,108 solar facilities. Public sources indicate at least nine news articles related to the plant, with coverage including deals, hazards, industry trends, and grid integration.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
161.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $112.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Pryor Junction Substation · 138 kV
Substation Distance
2.068 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
CSWS.NUEN.CSI1
Pricing Hub
SPPSOUTH_HUB
Location Type
Settlement Location
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Saltbranch 2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.