300 MW Batteries (150 MW) + Solar Photovoltaic (150 MW) planned in White, IL
300 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
38.0290, -88.2840
County
White, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Vesper Energy Development LLC | Vesper Energy | — |
| Owner(s) | Vesper Energy Development LLC | Vesper Energy | — |
| Status | Planned | announced | — |
GEM identifies the owner as Vesper Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Meadow Springs Renewable Energy (Hybrid) is a 300 MW hybrid power plant located in White County, Illinois. The facility, identified by plant ID 67986, is owned and operated by Vesper Energy Development LLC. It utilizes both solar photovoltaic technology and battery storage, with a fixed tilt solar tracking system. The plant's primary fuel source is electricity (MWH), reflecting its hybrid nature. It has two generators.
Meadow Springs operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC NERC region. Among hybrid plants in Illinois, it is ranked 1 out of 3. Nationally, it holds a rank of 156 out of 514 hybrid plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $408.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Norris City North Substation · 345 kV
Substation Distance
< 10 km
Operator
Ameren
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
ABB MISO IL
Pricing Hub
ILLINOIS.HUB
Alt. Hub / Zone
INDIANA.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.