Search plants, projects, owners, and states
500 MW Batteries (250 MW) + Solar Photovoltaic (250 MW) planned in Placer, CA
Plant location falls outside the published BA/NERC/RC polygon coverage (coastal or border edge case).
500 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
35.7549, -121.4071
County
Placer, CA
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Vesper Energy Development LLC | — | — |
| Owner(s) | Vesper Energy Development LLC | — | — |
| Status | Planned | announced | — |
Athens Solar I (Hybrid) is a 500 MW hybrid power plant located in Placer County, California. The facility, which combines solar photovoltaic generation with battery storage, is owned and operated by Vesper Energy Development LLC. It interconnects to the grid within the California Independent System Operator (CAISO) balancing authority, part of the Western Electricity Coordinating Council (WECC) NERC region. The plant utilizes fixed-tilt solar tracking technology.
The plant's primary fuel source is electricity (MWH), reflecting its hybrid nature. Athens Solar I (Hybrid) consists of two generators utilizing both solar photovoltaic and battery technologies. In terms of capacity, Athens Solar I (Hybrid) ranks as the 9th largest solar facility out of 112 in California and 63rd nationally out of 514.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $772.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
Plant coordinates only
Last updated 2026-03-26
View all articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo