100 MW BESS operating in Dickens, TX
100 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2025
Operating Since
Coordinates
33.7816, -100.8773
County
Dickens, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Burksol, LLC | — | — |
| Owner(s) | Burksol, LLC | — | — |
| Status | Operating | — | — |
Burksol Energy Storage is a 100 MW battery energy storage system located in Dickens County, Texas. The plant began operating in 2025 and is owned and operated by Burksol, LLC. It consists of a single generator utilizing battery technology and has a storage duration of 2 hours. The plant's primary fuel is listed as MWH, indicating it draws power from the grid to charge its batteries.
Burksol Energy Storage operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. In terms of size, it ranks 221 out of 224 power plants in Texas and 504 out of 514 nationally. News coverage related to the plant includes at least one article pertaining to deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−381 MWh
Net Charging
-6.5K MWh
Annual Net Energy
-0.9%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $136.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Cottonwood Substation · 345 kV
Substation Distance
< 10 km
Operator
Wind Energy Transmission Texas
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
W_CW_345BUS1
Pricing Hub
HB_WEST
Node Source
EIA-860 direct report
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Burksol Energy StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.