Search plants, projects, owners, and states
1.7 MW Solar operating in La Plata, CO
1.7 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
37.1241, -107.8602
County
La Plata, CO
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | La Plata Electric Assn, Inc | — | — |
| Owner(s) | La Plata Electric Assn, Inc | — | — |
| Status | Operating | operating | — |
The LPEA Sunnyside Solar 1 Facility is a 1.7 MW solar photovoltaic power plant located in La Plata County, Colorado. The plant began operating in 2024 and is owned and operated by La Plata Electric Assn, Inc. It consists of a single generator utilizing single-axis tracking to maximize solar energy capture. The plant is interconnected to the grid within the Western Area Power Administration - Rocky Mountain Region balancing authority, operating within the WECC NERC region.
In its first year of operation, the facility generated 4,586 MWh of electricity, achieving a capacity factor of 30.7%. According to state rankings, the LPEA Sunnyside Solar 1 Facility is the 106th largest of 177 solar plants in Colorado. Nationally, it ranks as the 5584th largest of 7108 solar plants in the United States.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Western Area Power Administration - Rocky Mountain Region (WACM)
Grid Voltage
12.5 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
228 MWh
Latest Month
4.6K MWh
Annual Generation
30.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $2.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about LPEA Sunnyside Solar 1 FacilityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.