Search plants, projects, owners, and states
5 MW Solar operating in Columbia, NY
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
42.2700, -73.7480
County
Columbia, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catskill View Solar, LLC | — | — |
| Owner(s) | Catskill View Solar, LLC | — | — |
| Status | Operating | operating | — |
Catskill Solar is a 5 MW solar photovoltaic power plant located in Columbia County, New York. The plant began operating in 2023 and has a single generator. It is owned and operated by Catskill View Solar, LLC. The plant's primary fuel source is solar energy.
Catskill Solar operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its latest year of operation, the plant generated 1,091 MWh of electricity, achieving a capacity factor of 2.5%. Catskill Solar ranks as the 142nd largest power plant in New York out of 695 plants, and ranks 2492nd nationally out of 7108 plants. The solar panels at Catskill Solar utilize single-axis tracking technology.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
41 MWh
Latest Month
1.1K MWh
Annual Generation
2.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2024
$33.3/MWh
Energy Value
$8.5/MWh
Capacity Value
Point of Interconnection
Nearest Substation
ATHENS_STG_1
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone F
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Catskill Solar