189 MW Wind operating in Chowan, NC
189 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2024
Operating Since
Coordinates
36.1519, -76.6010
County
Chowan, NC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Timbermill Wind | Apex Clean Energy | — |
| Owner(s) | Apex Clean Energy | Apex Clean Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as Apex Clean Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Timbermill Wind, LLC is a 189 MW wind power plant located in Chowan County, North Carolina. The facility began operating in 2024 and is owned and operated by Timbermill Wind. It utilizes a single generator consisting of onshore wind turbine technology. The plant is interconnected to the grid within the PJM Interconnection, LLC balancing authority and the SERC NERC region.
The wind farm's turbines have a hub height of 105 meters and a rotor diameter of 150 meters. The turbines were manufactured by Vestas and are model V150-4.2. In its most recent year of operation, Timbermill Wind generated 375,577 MWh of electricity, achieving a capacity factor of 22.7%. The plant is currently ranked as the second-largest wind farm in North Carolina, and 382nd nationally out of 734 wind plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
38.8K MWh
Latest Month
375.6K MWh
Annual Generation
22.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,468/kW
Est. Construction Cost
Total estimated cost: $277.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
PEMBROKE34.5 KV TIMBERWF
Pricing Hub
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 5 articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.