Canceled or postponed, according to EIA. Last listed as operating or planned in August 2025. EIA-860M · Sep 2026
800 MW Batteries (400 MW) + Solar Photovoltaic (400 MW) in Henderson, TX
800 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
32.1115, -95.9614
County
Henderson, TX
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | 210MS 8me, LLC | — | — |
| Owner(s) | 210MS 8me, LLC | — | — |
| Status | Canceled or postponed | announced | — |
Brittlebush Solar and Battery Storage is a hybrid power plant located in Henderson County, Texas. The facility has a total capacity of 800 MW and is operated by 210MS 8me, LLC. The plant utilizes both solar photovoltaic technology and batteries for energy storage, with two generators on site. Its primary fuel source is electricity (MWH).
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Brittlebush is a significant power producer in Texas, ranking as the 8th largest out of 224 plants in the state, and 21st nationally out of 514 plants. The solar component of the plant uses a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $1.2B
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all 8 articlesNo Ask reports yet for this entity.
Ask about Brittlebush Solar and Battery StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.